Designing of HDD pipes according to DWA-A 161 / DVGW GW 312 |
Frederik Müller |
IngSoft |
Germany |
Pipeline Technology Conference 2023 |
Crossing with Care - Major HDD crossings on the TAP project |
Denis Pellerin |
Horizontal Drilling International (HDI) |
France |
Pipeline Technology Conference 2019 |
Defining the Limits Of Application Of Directional Drilling Technology During Construction Of Pipeline Underwater Crossings |
Dmitry Shatalov |
Pipeline Transport Institute (PTI LLC) |
Russia |
Pipeline Technology Conference 2018 |
Continuous Monitoring of Pipe Coating During Pulling Operation in a Horizontal Directional Drilling (HDD) |
Kamyar Darbandi |
Steffel |
Germany |
Pipeline Technology Conference 2015 |
Trenchless Pipeline Removal (TPR) |
Benedetta Furlani |
ENERECO Engineering and Consulting |
Italy |
Pipeline Technology Conference 2014 |
Trenchless Installation with Polyamid 12 - the new protection for pipes |
Markus Hartmann |
Evonik Industries |
Germany |
Pipeline Technology Conference 2017 |
Trenchless rehabilitation of water mains with a Kevlar reinforced composite lining system |
Andreas Gross |
Rädlinger Primus Line |
Germany |
Pipeline Technology Conference 2018 |
Construction of a high-pressure gas pipeline PN 25 by means of trenchless technologies in the Czech Republic |
Robert Goletz |
Rädlinger Primus Line |
Germany |
Pipeline Technology Conference 2019 |
Nord Stream Onshore Pipeline Projects OPAL and NEL. Extraordinary Constructions for River Crossings by HDD or Microtunnel |
Stefan Scholz |
GASCADE Gastransport |
Germany |
Pipeline Technology Conference 2012 |
Soil Friction Modeling in HDDs under Operational Conditions |
Frigco Kwaaitaal |
Tebodin Netherlands |
Netherlands |
Pipeline Technology Conference 2012 |
A Major Step for a Pipeline: Crossing the Serra do Mar State Park in Brazil |
Philipp Elsner |
Babendererde Engineers |
Germany |
Pipeline Technology Conference 2012 |
Efficient application of the Horizontal Directional Drilling technology in pipeline construction |
Dr. Hans-Joachim Bayer |
TRACTO-TECHNIK |
Germany |
Pipeline Technology Conference 2013 |
Trenchless replacement of defective sewer pipelines using pipe bursting |
Daniel Mertens |
TRACTO-TECHNIK |
Germany |
Pipeline Technology Conference 2016 |
Pipe Ramming machines for HDD Assist & Rescue ensuring smoothly running pipeline jobsites |
Dr. Hans-Joachim Bayer |
TRACTO-TECHNIK |
Germany |
Pipeline Technology Conference 2017 |
An Innovative New Technology for Trenchless Rehabilitation of High Pressure Gas/Liquid Transmission Pipelines |
Dr. Melvin F. Kanninen |
Smart Pipe Corporation |
United States |
Pipeline Technology Conference 2008 |