Technoeconomic Optimisation of Long Distance Large Capacity Pipelines |
Lars Bangert |
ILF Consulting Engineers |
Germany |
Pipeline Technology Conference 2006 |
Asset Management, Planning and Design |
The novel Wehocoat field joint coating technology for PE onshore pipelines |
Thomas Stark |
Borealis Polymere GmbH |
Germany |
Pipeline Technology Conference 2011 |
Coating, Planning and Design |
Current View of Design and Evaluation of Sulfur Pipelines |
Dr. Kai Bauerbach |
MMEC Mannesmann |
Germany |
Pipeline Technology Conference 2019 |
Planning and Design |
Nord Stream Onshore Pipeline Projects OPAL and NEL. Extraordinary Constructions for River Crossings by HDD or Microtunnel |
Stefan Scholz |
GASCADE Gastransport |
Germany |
Pipeline Technology Conference 2012 |
Construction, Trenchless Technologies, Planning and Design |
Perspective on the development of European Gas Infrastructure |
Oliver Giese |
E.ON Ruhrgas AG |
Germany |
Pipeline Technology Conference 2011 |
Planning and Design |
A Comprehensive Quality Guideline for the Treatment of Unexploded Ordnance Encountered During Offshore Pipeline Construction |
Torsten Frey |
Leipzig University, IIRM |
Germany |
Pipeline Technology Conference 2019 |
Construction, Environmental Impact, Offshore, Planning and Design |
Oooguruk Stretching the Limits of Experience in Alaska |
Michael Bick |
Mannesmann Line Pipe |
Germany |
Pipeline Technology Conference 2007 |
Offshore, Construction, Planning and Design |
Combined wastewater feed directly into final clarification – advantage for receiving rivers |
Prof. Dr. Peter Hartwig |
aqua consult Ingenieur |
Germany |
Pipeline Technology Conference 2016 |
Sewer, Planning and Design |
Pipe Express® - An innovative method for environmentally friendly and economical pipeline installation |
Diana Pfeff |
Herrenknecht |
Germany |
Pipeline Technology Conference 2013 |
Planning and Design, Instrumentation |
EPRG - Research for Pipeline Safety |
Dr. Gerhard Knauf |
Salzgitter Mannesmann Forschung |
Germany |
Pipeline Technology Conference 2006 |
Safety, Planning and Design, Materials |
Earth-Laid Transport Pipes for -162°C to +400°C |
David Fröhlich |
FW-Fernwärme-Technik-GmbH |
Germany |
Pipeline Technology Conference 2011 |
Construction, Planning and Design |
Emergency Planning and Counter Measures |
Dirk Strack |
TAL Group |
Germany |
Pipeline Technology Conference 2012 |
Planning and Design, Safety |
How to make a major Pipeline Project bankable – case study TAPI Pipeline |
Dr. Stefan Bürkle |
ILF Consulting Engineers |
Germany |
Pipeline Technology Conference 2017 |
Planning and Design |
Pushing the Limit - Pipeline Installation Design Aspects |
Tim Jaguttis |
de la Motte & Partner |
Germany |
Pipeline Technology Conference 2022 |
Planning and Design, Simulation |
Planned and Ongoing Pipeline Projects for Caspian Oil and Gas. A Race between Europe and China? |
Christian Heinz |
ILF Consulting Engineers |
Germany |
Pipeline Technology Conference 2011 |
Planning and Design, Route Analysis |
Where offshore meets onshore: Trenchless solutions for pipeline landfalls |
Michael Lubberger |
Herrenknecht |
Germany |
Pipeline Technology Conference 2019 |
Construction, Environmental Impact, Planning and Design, Trenchless Technologies |
Causes, Assessment and Reduction Of Piping Vibrations |
Robert Missal |
KÖTTER Consulting Engineers |
Germany |
Pipeline Technology Conference 2007 |
Planning and Design |
Nabucco Pipeline Project |
Dr. Jürgen Grönner |
RWE Rheinland Westfalen Netz AG |
Germany |
Pipeline Technology Conference 2010 |
Planning and Design |
Hydrogen Infeed To Natural Gas Grid - Overview |
Guntram Schnotz |
TÜV SÜD |
Germany |
Pipeline Technology Conference 2018 |
Planning and Design, Hydrogen |
Stress Analysis of 100 km Pipeline per Day |
Dr. Robert Ofner |
ILF Consulting Engineers |
Germany |
Pipeline Technology Conference 2021 |
Integrity Management, Planning and Design |
Pipeline-Integrity-Management-System - Quality Assurance for Design, Laying and Operation of Pipelines |
Dr. Manfred Veenker |
Dr.-Ing. Veenker Ingenieurges. |
Germany |
Pipeline Technology Conference 2006 |
Integrity Management, Planning and Design |
Peak Oil: Is Natural Gas Capable to Fill the Gap? |
Prof. Dr. Hans-Joachim Kümpel |
Federal Institute for Geosciences and Natural Resources (BGR) |
Germany |
Pipeline Technology Conference 2009 |
Planning and Design |
Digital communication demands for construction safety and network expansion |
Jens Focke |
BIL - Federal German Construction Enquiry Portal |
Germany |
Pipeline Technology Conference 2021 |
Construction, Digitalization, Planning and Design |
Nabucco Gas Pipeline Project - A challenging project in the prequlification phase |
Michael Küpper |
TÜV International |
Germany |
Pipeline Technology Conference 2011 |
Standards and Regulations, Planning and Design |
The Innovative Direct Pipe® Method – Case Histories |
Diana Pfeff |
Herrenknecht |
Germany |
Pipeline Technology Conference 2010 |
Planning and Design |